Concrete Estimator
By Sam Shah · Updated
Concrete volume is slab length multiplied by width and depth, with extra material allowed for waste.
Quick Facts
- •1 cubic yard = 27 cubic feet
- •A 60 lb bag yields ~0.45 cu ft
- •An 80 lb bag yields ~0.6 cu ft
- •4" depth is standard for patios
How to Estimate Concrete
Concrete is measured in cubic yards. For a slab, calculate length × width × depth (in feet), then divide by 27 to convert to cubic yards. Always order 10% extra to account for waste, uneven ground, and spillage. A standard 4-inch thick slab is suitable for patios and walkways. You can also estimate project materials with our mulch/soil/gravel calculator and our lumber board feet, or convert area measurements with our square feet to square meters converter and our acres to hectares converter.
How does Concrete Estimator work?
Concrete is ordered by volume, so the whole job is a volume calculation plus a waste allowance. Getting it wrong in either direction is expensive: too little means a cold joint mid-pour, too much means paying for concrete you have to dispose of.
Worked examples
Concrete for a 10 ft by 12 ft slab, 4 inches thick
- 1Convert thickness to feet: 4 ÷ 12 = 0.333 ft.
- 2Volume = 10 × 12 × 0.333 = 40 cubic feet.
- 3Convert to cubic yards: 40 ÷ 27 = 1.48 cu yd.
- 4Add 10 percent for spillage and uneven subgrade: 1.63 cu yd.
Order 1.75 cubic yards, since suppliers sell in quarter yard steps.
Concrete for four post holes, 300 mm across and 900 mm deep
- 1Radius = 0.15 m, so area = π × 0.15² = 0.0707 sq m.
- 2Volume per hole = 0.0707 × 0.9 = 0.0636 cu m.
- 3Four holes = 0.255 cu m.
- 4Subtract the post volume if it is substantial, then add 10 percent: about 0.28 cu m.
About 0.28 cubic meters, which is roughly 14 bags of 20 kg ready mix per hole set.
Slab volume by area and thickness
Cubic yards required before the waste allowance.
| Area | 4 in thick | 5 in thick | 6 in thick |
|---|---|---|---|
| 50 sq ft | 0.62 | 0.77 | 0.93 |
| 100 sq ft | 1.23 | 1.54 | 1.85 |
| 200 sq ft | 2.47 | 3.09 | 3.70 |
| 400 sq ft | 4.94 | 6.17 | 7.41 |
| 600 sq ft | 7.41 | 9.26 | 11.11 |
Bagged concrete yield
| Bag size | Yield | Bags per cubic yard |
|---|---|---|
| 40 lb | 0.30 cu ft | 90 |
| 60 lb | 0.45 cu ft | 60 |
| 80 lb | 0.60 cu ft | 45 |
| 20 kg | 0.010 cu m | 100 per cu m |
| 25 kg | 0.0125 cu m | 80 per cu m |
Above about one cubic yard, ready mix delivery is usually cheaper and far faster than mixing bags.
Frequently asked questions
How much waste should I allow?
Ten percent is standard for a flat slab on a well prepared subgrade. Allow 15 percent for footings, trenches, or anything dug by hand, because excavations are always slightly larger than drawn.
How thick should a slab be?
Four inches suits patios, sheds, and footpaths. Five to six inches with reinforcement is normal for driveways and anything carrying vehicles. Local building codes may set a minimum, and a heavy load or poor soil calls for engineering advice.
How long before I can walk or drive on it?
Foot traffic is usually fine after 24 to 48 hours. Vehicles should wait 7 days, and concrete reaches its specified strength at 28 days. Keeping the surface damp for the first week significantly improves the final strength.
Do I need reinforcement?
Steel mesh or rebar controls cracking rather than preventing it. Use it for driveways, any slab over about 10 square meters, and anywhere the ground may move. Control joints cut at intervals of roughly 24 to 30 times the slab thickness give cracks a place to go.
More Construction & DIY Tools
This calculator is for educational and reference purposes only. Always verify critical calculations independently.